WHAT WE DID:
High Voltage/Low Voltage and Fibre optic terminating/jointing and testing. CJS were also responsible for distribution and ownership of materials, during the works we completed progress reports and shift handovers.

WHAT THEY SAID:
The management team from Aker would like to thank CJS for their continuous professionalism and support on this project. CJS have always displayed excellent workmanship in all aspects of the project. All your engineers have displayed exemplary attitudes and worked well alongside our own engineers. All work carried out by you engineers was completed in a timely, safe manner and to a high standard. Aker looks forward to working alongside CJS on future projects.